Now that rough mechanicals are in and the air barrier system has been successfully tested, finishes are going in.These will get a lot more exciting pretty soon as tile, wood trim and accents, cabinetry and countertops, etc. get installed, but that will be next.
This stage of construction is where a lot of toxicity can enter a project, but we and Evolutionary Home Builders (contractor) are vigilant about keeping interiors healthy. Adhesives, caulks, primers and paints, and floor finish have been selected to minimize toxicity: low VOC is not enough: we look for zero VOC, non-toxic, GreenGaurd Certified products, and of course no added urea formaldehyde. At the end of construction we hire a third party to test the air for aldehydes and VOCs, so we are especially motivated to keep it clean. It makes such a difference--this jobsite has never had that awful toxic "new car" smell you get on so many construction sites. We're very grateful for the vigilance EHB brings to the project.
 |
upper landing |
 |
upper hall looking east to master |
 |
ground, polished, and stained concrete floor |
 |
reclaimed hickory flooring going in... |
 |
...and hickory finished with Rubio Monocoat natural |
 |
panels on north side |
 |
10" exposure LP SmartSide smooth siding |